By adding perforation belts can do additional jobs.
The first one is as below.
Jigs are fixed on every pair of holes on a belt.
Those jigs accept parts and these parts receive a certain process, assembly or inspection. This whole conveyance is done by takt drive, using sprocket pulley pin holes.